Meramec Basin Project
The free-flowing Meramec River narrowly avoided having several dams built on it by the Corps of Engineers. The United States Congress authorized several large dams in the upper Mississippi and Meramec river basins in 1938 following severe flooding in 1927 and 1937. World War II intervened, and plans were delayed and altered, but the Meramec Basin Project finally started moving forward in the 1960s. The main dam was to be at Sullivan, Missouri, at Meramec State Park, with several additional dams upstream. These plans ran into opposition from the growing environmental movement of the 1960s and 1970s, as well as from recreational users of the free-flowing Meramec. The failure of the Teton Dam in 1976 increased the public's doubt about the wisdom of the project.
Grass-roots opposition forced politicians originally in favor of the project to reconsider. At the request of Senators Jack Danforth and Tom Eagleton, Missouri Governor Kit Bond allowed a non-binding referendum to be put on ballots in twelve surrounding counties. On August 8, 1978, 64 percent of the voters rejected the dam proposal. The referendum carried no legal weight but caused Congress to reconsider. Under President Jimmy Carter, funding was removed from the project. In 1981, President Ronald Reagan signed the bill de-authorizing the project. This was the first time that a Corps of Engineers project was stopped once construction had already begun, and it marked a major victory for the American environmental movement.
Read more about this topic: Meramec River
Famous quotes containing the word project:
“... one of art photographys most vigorous enterprises[is] concentrating on victims, on the unfortunatebut without the compassionate purpose that such a project is expected to serve.”
—Susan Sontag (b. 1933)