List of Tunnels in New Zealand - For Hydroelectric Usage

For Hydroelectric Usage

  • Manapouri Power Station - Machine hall 111 m long, 18 m wide, 34 m high, and road access tunnel 2040 m long, 6.7 m wide and high, with a semi-circular arch roof.
  • Manapouri Tailrace - 2 tunnels - original tailrace tunnel 9817 m long, 9.2 m diameter horseshoe section, commenced 1964, breakthrough 1968 drill-and-blast construction, 16 deaths. Second tailrace tunnel 9829 m long, 10.05 m diameter, circular section, commenced 1997, breakthrough 2001, commissioned April 2002, tunnel boring machine construction, 0 deaths.
  • Tongariro Power Scheme

Read more about this topic:  List Of Tunnels In New Zealand