Redesign and Construction
Due to the deteriorated condition of the freeway system, obsolete design of the roadway and bridges, current and future capacity, and high crash rates, the Zoo interchange is being redesigned to increase efficiency, reduce accidents and add capacity. Reconstruction is scheduled to begin in 2013 and end in 2018 with some preparatory work being completed in 2012 that will help allow for the re-routing of traffic during construction.
Read more about this topic: Zoo Interchange
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”