Construction started in 1950 and was completed in 1957. The complex consists of earth-fill dam, 2800 m long, 750 m wide and 52 m high, concrete spillway dam, 980 m long, power plant house, 700 m long, and two-lane navigable locks. Installed power is 2315 MW, average annual production is 10,500 GWh. The power house has 20 generator units with Kaplan turbines, 17 of 65 MW and 3 of 120 MW at 22.5 m head. The dam forms Kuybyshev Reservoir.

Read more about this topic:  Zhiguli Hydroelectric Station

Famous quotes containing the words general and/or data:

    The first general store opened on the ‘Cold Saturday’ of the winter of 1833 ... Mrs. Mary Miller, daughter of the store’s promoter, recorded in a letter: ‘Chickens and birds fell dead from their roosts, cows ran bellowing through the streets’; but she failed to state what effect the freeze had on the gala occasion of the store opening.
    —Administration in the State of Sout, U.S. public relief program (1935-1943)

    Mental health data from the 1950’s on middle-aged women showed them to be a particularly distressed group, vulnerable to depression and feelings of uselessness. This isn’t surprising. If society tells you that your main role is to be attractive to men and you are getting crow’s feet, and to be a mother to children and yours are leaving home, no wonder you are distressed.
    Grace Baruch (20th century)