Zhengzhou Metro Line No. 2
Zhengzhou Metro Line 2, a north-south line with a total length of 27.30 km, starting from Huiji District and ending in Zhanmatun, with 21 Stations. The phase currently under construction has 16 stations (14 underground, 2 elevated), 19.05 km (17.25 km underground), opening 2015.
Read more about this topic: Zhengzhou Metro
Famous quotes containing the word line:
“We have not passed that subtle line between childhood and adulthood until we move from the passive voice to the active voicethat is, until we have stopped saying It got lost, and say, I lost it.”
—Sydney J. Harris (b. 1917)