York Region Transit - Bus Rapid Transit

Bus Rapid Transit

In response to escalating congestion on the region's roads, York Region's transit plan included a provision for a bus rapid transit (BRT) system along the Yonge Street and Highway 7 arterial corridors. This service, known as Viva, was launched in September 2005.

Construction on Phase 2 began in 2009, with the construction of a bus-only roadway parallel to Enterprise Drive. Construction of bus-only lanes on Highway 7 began in 2010, and construction on Yonge Street is expected to be started 2012.


Read more about this topic:  York Region Transit

Famous quotes containing the words bus, rapid and/or transit:

    Literature transforms and intensifies ordinary language, deviates systematically from everyday speech. If you approach me at a bus stop and murmur “Thou still unravished bride of quietness,” then I am instantly aware that I am in the presence of the literary.
    Terry Eagleton (b. 1943)

    In clear weather the laziest may look across the Bay as far as Plymouth at a glance, or over the Atlantic as far as human vision reaches, merely raising his eyelids; or if he is too lazy to look after all, he can hardly help hearing the ceaseless dash and roar of the breakers. The restless ocean may at any moment cast up a whale or a wrecked vessel at your feet. All the reporters in the world, the most rapid stenographers, could not report the news it brings.
    Henry David Thoreau (1817–1862)

    There’s that popular misconception of man as something between a brute and an angel. Actually man is in transit between brute and God.
    Norman Mailer (b. 1923)