Original Development By Statoil
The field was produced by Statoil from February 1996 until it was closed down in 2001. The field was produced using the jackup rig Maersk Giant equipped with oil producing facilities. The produced oil was transferred to the tanker Polysaga. Polysaga had a storage capacity of up to 160,000 cu meters of oil. It was moored and loaded by the subsea turret loading system (STL). The oil from Polysaga was offloaded to a shuttle tanker and transported to the Statoil Mongstad terminal near Bergen for final processing and fiscal metering. Mongstad had to beef up its desalters in order to be able to handle the Yme crude. The field was abandoned in a time of low oil prices after having produced 56 million barrels (8.9×106 m3) of oil (15% recovery of original oil in place).
Read more about this topic: Yme Field
Famous quotes containing the words original and/or development:
“He had been a lad of whom something was expected. Beyond this all had been chaos. That he would be successful in an original way, or that he would go to the dogs in an original way, seemed equally probable. The only absolute certainty about him was that he would not stand still in the circumstances amid which he was born.”
—Thomas Hardy (18401928)
“I can see ... only one safe rule for the historian: that he should recognize in the development of human destinies the play of the contingent and the unforeseen.”
—H.A.L. (Herbert Albert Laurens)