Original Development By Statoil
The field was produced by Statoil from February 1996 until it was closed down in 2001. The field was produced using the jackup rig Maersk Giant equipped with oil producing facilities. The produced oil was transferred to the tanker Polysaga. Polysaga had a storage capacity of up to 160,000 cu meters of oil. It was moored and loaded by the subsea turret loading system (STL). The oil from Polysaga was offloaded to a shuttle tanker and transported to the Statoil Mongstad terminal near Bergen for final processing and fiscal metering. Mongstad had to beef up its desalters in order to be able to handle the Yme crude. The field was abandoned in a time of low oil prices after having produced 56 million barrels (8.9×106 m3) of oil (15% recovery of original oil in place).
Read more about this topic: Yme Field
Famous quotes containing the words original and/or development:
“The salary cap ... will be accepted about the time the 13 original states restore the monarchy.”
—Tom Reich, U.S. baseball agent. New York Times, p. 16B (August 11, 1994)
“The young women, what can they not learn, what can they not achieve, with Columbia University annex thrown open to them? In this great outlook for womens broader intellectual development I see the great sunburst of the future.”
—M. E. W. Sherwood (18261903)