Yme Field - Original Development By Statoil

Original Development By Statoil

The field was produced by Statoil from February 1996 until it was closed down in 2001. The field was produced using the jackup rig Maersk Giant equipped with oil producing facilities. The produced oil was transferred to the tanker Polysaga. Polysaga had a storage capacity of up to 160,000 cu meters of oil. It was moored and loaded by the subsea turret loading system (STL). The oil from Polysaga was offloaded to a shuttle tanker and transported to the Statoil Mongstad terminal near Bergen for final processing and fiscal metering. Mongstad had to beef up its desalters in order to be able to handle the Yme crude. The field was abandoned in a time of low oil prices after having produced 56 million barrels (8.9×10^6 m3) of oil (15% recovery of original oil in place).

Read more about this topic:  Yme Field

Famous quotes containing the words original and/or development:

    If we remembered everything, we should on most occasions be as ill off as if we remembered nothing. It would take us as long to recall a space of time as it took the original time to elapse, and we should never get ahead with our thinking. All recollected times undergo, accordingly, what M. Ribot calls foreshortening; and this foreshortening is due to the omission of an enormous number of facts which filled them.
    William James (1842–1910)

    Such condition of suspended judgment indeed, in its more genial development and under felicitous culture, is but the expectation, the receptivity, of the faithful scholar, determined not to foreclose what is still a question—the “philosophic temper,” in short, for which a survival of query will be still the salt of truth, even in the most absolutely ascertained knowledge.
    Walter Pater (1839–1894)