Yme Field - Original Development By Statoil

Original Development By Statoil

The field was produced by Statoil from February 1996 until it was closed down in 2001. The field was produced using the jackup rig Maersk Giant equipped with oil producing facilities. The produced oil was transferred to the tanker Polysaga. Polysaga had a storage capacity of up to 160,000 cu meters of oil. It was moored and loaded by the subsea turret loading system (STL). The oil from Polysaga was offloaded to a shuttle tanker and transported to the Statoil Mongstad terminal near Bergen for final processing and fiscal metering. Mongstad had to beef up its desalters in order to be able to handle the Yme crude. The field was abandoned in a time of low oil prices after having produced 56 million barrels (8.9×10^6 m3) of oil (15% recovery of original oil in place).

Read more about this topic:  Yme Field

Famous quotes containing the words original and/or development:

    “In the Original Unity of the First Thing lies the Secondary Cause of All Things, with the Germ of their Inevitable Annihilation.”
    —Edgar Allan Poe (1809–1849)

    “Dissonance between family and school, therefore, is not only inevitable in a changing society; it also helps to make children more malleable and responsive to a changing world. By the same token, one could say that absolute homogeneity between family and school would reflect a static, authoritarian society and discourage creative, adaptive development in children.”
    —Sara Lawrence Lightfoot (20th century)