Yme Field - Original Development By Statoil

Original Development By Statoil

The field was produced by Statoil from February 1996 until it was closed down in 2001. The field was produced using the jackup rig Maersk Giant equipped with oil producing facilities. The produced oil was transferred to the tanker Polysaga. Polysaga had a storage capacity of up to 160,000 cu meters of oil. It was moored and loaded by the subsea turret loading system (STL). The oil from Polysaga was offloaded to a shuttle tanker and transported to the Statoil Mongstad terminal near Bergen for final processing and fiscal metering. Mongstad had to beef up its desalters in order to be able to handle the Yme crude. The field was abandoned in a time of low oil prices after having produced 56 million barrels (8.9×10^6 m3) of oil (15% recovery of original oil in place).

Read more about this topic:  Yme Field

Famous quotes containing the words original and/or development:

    A good scientist is a person with original ideas. A good engineer is a person who makes a design that works with as few original ideas as possible. There are no prima donnas in engineering.
    Freeman Dyson (b. 1923)

    And then ... he flung open the door of my compartment, and ushered in “Ma young and lovely lady!” I muttered to myself with some bitterness. “And this is, of course, the opening scene of Vol. I. She is the Heroine. And I am one of those subordinate characters that only turn up when needed for the development of her destiny, and whose final appearance is outside the church, waiting to greet the Happy Pair!”
    Lewis Carroll [Charles Lutwidge Dodgson] (1832–1898)