Yankee Cannonball - Rolling Stock

Rolling Stock

The Yankee Cannonball has two trains, but only one runs at a time. There are 6 riders per car, for a total of 18 riders per train. The trains were built by Philadelphia Toboggan Coasters. Restraints consist of headrests and lap bars, and seat belts were added for the 2003 season, as a response to a 2001 accident, in which the two trains collided at the foot of the lift hill due to operator failure in engaging the brakes.

Read more about this topic:  Yankee Cannonball

Famous quotes containing the words rolling and/or stock:

    The gods had condemned Sisyphus to ceaselessly rolling a rock to the top of a mountain, whence the stone would fall back of its own weight. They had thought with some reason that there is no more dreadful punishment than futile and hopeless labor.
    Albert Camus (1913–1960)

    I consider that a man’s brain originally is like a little empty attic, and you have to stock it with such furniture as you choose.
    Sir Arthur Conan Doyle (1859–1930)