Background
The feasibility study for the dam was completed in 1992, with it as part of the Lancang River Project. In 1995 the report was reviewed and approved by the Chinese government. Three years later in 1998, a consortium to fund and construct the dam was organized. In 1999, preliminary construction (roads, bridges, river diversion) began. Official construction on the dam started on 1 January 2002. The river was diverted by November 2003 and concrete pouring began in 2005. The river diversion was closed and the reservoir began to impound in November 2007. The first generator was commissioned in September 2009 and the dam was complete in March 2010. The last of the six generators went operational on 22 August 2010. The creation of the dam's reservoir submerged 55,678 ha (137,583 acres) of land and displaced 32,737 people.
Read more about this topic: Xiaowan Dam
Famous quotes containing the word background:
“In the true sense ones native land, with its background of tradition, early impressions, reminiscences and other things dear to one, is not enough to make sensitive human beings feel at home.”
—Emma Goldman (18691940)
“I had many problems in my conduct of the office being contrasted with President Kennedys conduct in the office, with my manner of dealing with things and his manner, with my accent and his accent, with my background and his background. He was a great public hero, and anything I did that someone didnt approve of, they would always feel that President Kennedy wouldnt have done that.”
—Lyndon Baines Johnson (19081973)
“... every experience in life enriches ones background and should teach valuable lessons.”
—Mary Barnett Gilson (1877?)