Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“The gold-digger is the enemy of the honest laborer, whatever checks and compensations there may be. It is not enough to tell me that you worked hard to get your gold. So does the Devil work hard. The way of transgressors may be hard in many respects.”
—Henry David Thoreau (18171862)
“... whats been building since the 1980s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. Thats what will last after this flurry on family values.”
—Stephanie Coontz (b. 1944)
“When a house is tottering to its fall,
The strain lies heaviest on the weakest part,
One tiny crack throughout the structure spreads,
And its own weight soon brings it toppling down.”
—Ovid (Publius Ovidius Naso)