Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Basil: What I meant was, what work do you do?
Zorba: Listen to him. I got hands, feet, head, they do the jobs. Who the hell am I to choose?”
—Michael Cacoyannis (b. 1922)
“The chief lesson of the Depression should never be forgotten. Even our liberty-loving American people will sacrifice their freedom and their democratic principles if their security and their very lives are threatened by another breakdown of our free enterprise system. We can no more afford another general depression than we can afford another total war, if democracy is to survive.”
—Agnes E. Meyer (18871970)
“Agnosticism is a perfectly respectable and tenable philosophical position; it is not dogmatic and makes no pronouncements about the ultimate truths of the universe. It remains open to evidence and persuasion; lacking faith, it nevertheless does not deride faith. Atheism, on the other hand, is as unyielding and dogmatic about religious belief as true believers are about heathens. It tries to use reason to demolish a structure that is not built upon reason.”
—Sydney J. Harris (19171986)