Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Erasmus was the light of his century; others were its strength: he lighted the way; others knew how to walk on it while he himself remained in the shadow as the source of light always does. But he who points the way into a new era is no less worthy of veneration than he who is the first to enter it; those who work invisibly have also accomplished a feat.”
—Stefan Zweig (18811942)
“The chief lesson of the Depression should never be forgotten. Even our liberty-loving American people will sacrifice their freedom and their democratic principles if their security and their very lives are threatened by another breakdown of our free enterprise system. We can no more afford another general depression than we can afford another total war, if democracy is to survive.”
—Agnes E. Meyer (18871970)
“The philosopher believes that the value of his philosophy lies in its totality, in its structure: posterity discovers it in the stones with which he built and with which other structures are subsequently built that are frequently betterand so, in the fact that that structure can be demolished and yet still possess value as material.”
—Friedrich Nietzsche (18441900)