Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    “It is not true that there is dignity in all work. Some jobs are definitely better than others.... People who have good jobs are happy, rich, and well dressed. People who have bad jobs are unhappy, poor and use meat extenders. Those who seek dignity in the type of work that compels them to help hamburgers are certain to be disappointed.”
    —Fran Lebowitz (b. 1950)

    “... what’s been building since the 1980’s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. That’s what will last after this flurry on family values.”
    —Stephanie Coontz (b. 1944)

    “A special feature of the structure of our book is the monstrous but perfectly organic part that eavesdropping plays in it.”
    —Vladimir Nabokov (1899–1977)