Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    “Since ... six weeks ago, there has been no day in which I have not had letters and visits on the subject of my nomination for the Presidency.... I say very little. I have in no instance encouraged any one to work to that end.... I have said the whole talk about me is on the score of availability. Let availability do the work then.”
    —Rutherford Birchard Hayes (1822–1893)

    “... what’s been building since the 1980’s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. That’s what will last after this flurry on family values.”
    —Stephanie Coontz (b. 1944)

    “Science is intimately integrated with the whole social structure and cultural tradition. They mutually support one other—only in certain types of society can science flourish, and conversely without a continuous and healthy development and application of science such a society cannot function properly.”
    —Talcott Parsons (1902–1979)