Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    A good story is one that isn’t demanding, that proceeds from A to B, and above all doesn’t remind us of the bad times, the cardboard patches we used to wear in our shoes, the failed farms, the way people you love just up and die. It tells us instead that hard work and perseverance can overcome all obstacles; it tells lie after lie, and the happy ending is the happiest lie of all.
    Kathleen Norris (b. 1947)

    ... what’s been building since the 1980’s is a new kind of social Darwinism that blames poverty and crime and the crisis of our youth on a breakdown of the family. That’s what will last after this flurry on family values.
    Stephanie Coontz (b. 1944)

    The philosopher believes that the value of his philosophy lies in its totality, in its structure: posterity discovers it in the stones with which he built and with which other structures are subsequently built that are frequently better—and so, in the fact that that structure can be demolished and yet still possess value as material.
    Friedrich Nietzsche (1844–1900)