Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Auld Nature swears, the lovely Dears
Her noblest work she classes, O:
Her prentice han she tryd on man,
An then she made the lasses, O.”
—Robert Burns (17591796)
“The ideal of brotherhood of man, the building of the Just City, is one that cannot be discarded without lifelong feelings of disappointment and loss. But, if we are to live in the real world, discard it we must. Its very nobility makes the results of its breakdown doubly horrifying, and it breaks down, as it always will, not by some external agency but because it cannot work.”
—Kingsley Amis (19221995)
“Just as a new scientific discovery manifests something that was already latent in the order of nature, and at the same time is logically related to the total structure of the existing science, so the new poem manifests something that was already latent in the order of words.”
—Northrop Frye (b. 1912)