Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Anyone can do any amount of work, provided it isnt the work he is supposed to be doing.”
—Robert Benchley (18891945)
“A bad liver is to a Frenchman what a nervous breakdown is to an American. Everyone has had one and everyone wants to talk about it.”
—Art Buchwald (b. 1925)
“Who says that fictions only and false hair
Become a verse? Is there in truth no beauty?
Is all good structure in a winding stair?
May no lines pass, except they do their duty
Not to a true, but painted chair?”
—George Herbert (15931633)