Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“We didnt want any men in our group. They drink their loans, they dont work their stores. Why should we have to pay for their irresponsibilities?”
—Brachiate Guioth De Espinosa, Colombian storekeeper. As quoted in the New York Times, p. A6 (July 15, 1994)
“Where mass opinion dominates the government, there is a morbid derangement of the true functions of power. The derangement brings about the enfeeblement, verging on paralysis, of the capacity to govern. This breakdown in the constitutional order is the cause of the precipitate and catastrophic decline of Western society. It may, if it cannot be arrested and reversed, bring about the fall of the West.”
—Walter Lippmann (18891974)
“The verbal poetical texture of Shakespeare is the greatest the world has known, and is immensely superior to the structure of his plays as plays. With Shakespeare it is the metaphor that is the thing, not the play.”
—Vladimir Nabokov (18991977)