Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    A perfect personality ... is only possible in a state of society where man is free to choose the mode of work, the conditions of work, and the freedom to work. One to whom the making of a table, the building of a house, or the tilling of the soil, is what the painting is to the artist and the discovery to the scientist,—the result of inspiration, of intense longing, and deep interest in work as a creative force.
    Emma Goldman (1869–1940)

    A bad liver is to a Frenchman what a nervous breakdown is to an American. Everyone has had one and everyone wants to talk about it.
    Art Buchwald (b. 1925)

    ... the structure of our public morality crashed to earth. Above its grave a tombstone read, “Be tolerant—even of evil.” Logically the next step would be to say to our commonwealth’s criminals, “I disagree that it’s all right to rob and murder, but naturally I respect your opinion.” Tolerance is only complacence when it makes no distinction between right and wrong.
    Sarah Patton Boyle, U.S. civil rights activist and author. The Desegregated Heart, part 2, ch. 2 (1962)