Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Auld Nature swears, the lovely Dears
Her noblest work she classes, O:
Her prentice han she tryd on man,
An then she made the lasses, O.”
—Robert Burns (17591796)
“The chief lesson of the Depression should never be forgotten. Even our liberty-loving American people will sacrifice their freedom and their democratic principles if their security and their very lives are threatened by another breakdown of our free enterprise system. We can no more afford another general depression than we can afford another total war, if democracy is to survive.”
—Agnes E. Meyer (18871970)
“... the structure of a page of good prose is, analyzed logically, not something frozen but the vibrating of a bridge, which changes with every step one takes on it.”
—Robert Musil (18801942)