Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“[To an admirer who said, You look gorgeous:] Oh, God, if you only knew how much work it takes.”
—Julie Wilson (b. 1925)
“The ideal of brotherhood of man, the building of the Just City, is one that cannot be discarded without lifelong feelings of disappointment and loss. But, if we are to live in the real world, discard it we must. Its very nobility makes the results of its breakdown doubly horrifying, and it breaks down, as it always will, not by some external agency but because it cannot work.”
—Kingsley Amis (19221995)
“The philosopher believes that the value of his philosophy lies in its totality, in its structure: posterity discovers it in the stones with which he built and with which other structures are subsequently built that are frequently betterand so, in the fact that that structure can be demolished and yet still possess value as material.”
—Friedrich Nietzsche (18441900)