Work Breakdown Structure

Work Breakdown Structure

A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.

A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.

Read more about Work Breakdown Structure:  Overview, History, Example, Misconceptions

Famous quotes containing the words work, breakdown and/or structure:

    Writing a book I have found to be like building a house. A man forms a plan, and collects materials. He thinks he has enough to raise a large and stately edifice; but after he has arranged, compacted and polished, his work turns out to be a very small performance. The authour however like the builder, knows how much labour his work has cost him; and therefore estimates it at a higher rate than other people think it deserves,
    James Boswell (1740–1795)

    The ideal of brotherhood of man, the building of the Just City, is one that cannot be discarded without lifelong feelings of disappointment and loss. But, if we are to live in the real world, discard it we must. Its very nobility makes the results of its breakdown doubly horrifying, and it breaks down, as it always will, not by some external agency but because it cannot work.
    Kingsley Amis (1922–1995)

    There is no such thing as a language, not if a language is anything like what many philosophers and linguists have supposed. There is therefore no such thing to be learned, mastered, or born with. We must give up the idea of a clearly defined shared structure which language-users acquire and then apply to cases.
    Donald Davidson (b. 1917)