Work Breakdown Structure
A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.
A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control.
Read more about Work Breakdown Structure: Overview, History, Example, Misconceptions
Famous quotes containing the words work, breakdown and/or structure:
“Parenting can be established as a time-share job, but mothers are less good switching off their parent identity and turning to something else. Many women envy the fathers ability to set clear boundaries between home and work, between being an on-duty and an off-duty parent.... Women work very hard to maintain a closeness to their child. Fathers value intimacy with a child, but often do not know how to work to maintain it.”
—Terri Apter (20th century)
“The ideal of brotherhood of man, the building of the Just City, is one that cannot be discarded without lifelong feelings of disappointment and loss. But, if we are to live in the real world, discard it we must. Its very nobility makes the results of its breakdown doubly horrifying, and it breaks down, as it always will, not by some external agency but because it cannot work.”
—Kingsley Amis (19221995)
“The verbal poetical texture of Shakespeare is the greatest the world has known, and is immensely superior to the structure of his plays as plays. With Shakespeare it is the metaphor that is the thing, not the play.”
—Vladimir Nabokov (18991977)