Development Process
Because WMI abstracts the manageable entities with CIM and a collection of providers, the development of a provider implies several steps. The major steps can be summarized as follows:
Step 1 – Create the manageable entity model
- Define a model
- Implement the model
Step 2 – Create the WMI Provider
- Determine the provider type to implement
- Determine the hosting model of the provider
- Create the provider template with the ATL wizard
- Implement the code logic in the provider
- Register the provider with WMI and the system
Step 3 – Test the provider
Step 4 – Create consumer sample code
Read more about this topic: Windows Management Instrumentation
Famous quotes containing the words development and/or process:
“I hope I may claim in the present work to have made it probable that the laws of arithmetic are analytic judgments and consequently a priori. Arithmetic thus becomes simply a development of logic, and every proposition of arithmetic a law of logic, albeit a derivative one. To apply arithmetic in the physical sciences is to bring logic to bear on observed facts; calculation becomes deduction.”
—Gottlob Frege (18481925)
“We are in the process of creating what deserves to be called the idiot culture. Not an idiot sub-culture, which every society has bubbling beneath the surface and which can provide harmless fun; but the culture itself. For the first time, the weird and the stupid and the coarse are becoming our cultural norm, even our cultural ideal.”
—Carl Bernstein (b. 1944)