The Airport began a $3.8 million maintenance project in September 2011 to rehabilitate and repair two of its three parking garages. The project will make improvements to garages A and B, two of the six parking options at the airport. Garage A is the two-story garage that provides hourly parking for the airport’s short-term visitors on the upper level, and “ready-return” spaces for the rental car agencies on the lower level. Parking Garage B, adjacent to A, is the older of the two, five-level parking structures that provides covered parking for air travelers. Garage C, the new parking garage which opened in 2009, will not be impacted. Nearing middle age, (Garage A is 44 years old and Garage B is 31 years old,) the structures will undergo several different types of refurbishments that will extend the long-term use of the facilities. The work will include:
- Repair of concrete walls and pillars, specifically where there are cracks or spalling (chips of concrete that have broken off) and other deterioration
- Replacement or repair of exterior stairs
- Replacement and upgrade of all lighting circuits
- Replacement and upgrade of all lighting fixtures
- The top levels of each garage will receive new expansion joints, membrane coating, waterproofing and protectant to prevent leaking
The project will be divided into 12 sequences allowing the airport to keep as much of the garage open as possible. Most of the sequences will only require closing about 300 spaces at a time, leaving approximately 2,500 of the 2,800 total spaces in the two garages available for parking. The project work will start in the five-level Garage B on levels one and two. The entire project is anticipated to take 18 months. The most challenging portion of the project will be when the work commences on the two-story parking garage. During this sequencing, hourly parking and rental car companies will be moved to temporary locations in Garage B and C.