The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.

The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.

Read more about this topic:  Western Kentucky Parkway

Famous quotes containing the word history:

    America is the only nation in history which miraculously has gone directly from barbarism to degeneration without the usual interval of civilization.
    Georges Clemenceau (1841–1929)

    We have need of history in its entirety, not to fall back into it, but to see if we can escape from it.
    José Ortega Y Gasset (1883–1955)

    Considered in its entirety, psychoanalysis won’t do. It’s an end product, moreover, like a dinosaur or a zeppelin; no better theory can ever be erected on its ruins, which will remain for ever one of the saddest and strangest of all landmarks in the history of twentieth-century thought.
    Peter B. Medawar (1915–1987)