History
The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.
The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.
Read more about this topic: Western Kentucky Parkway
Famous quotes containing the word history:
“All history is a record of the power of minorities, and of minorities of one.”
—Ralph Waldo Emerson (18031882)
“The awareness that health is dependent upon habits that we control makes us the first generation in history that to a large extent determines its own destiny.”
—Jimmy Carter (James Earl Carter, Jr.)
“Most events recorded in history are more remarkable than important, like eclipses of the sun and moon, by which all are attracted, but whose effects no one takes the trouble to calculate.”
—Henry David Thoreau (18171862)