History
The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.
The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.
Read more about this topic: Western Kentucky Parkway
Famous quotes containing the word history:
“The only history is a mere question of ones struggle inside oneself. But that is the joy of it. One need neither discover Americas nor conquer nations, and yet one has as great a work as Columbus or Alexander, to do.”
—D.H. (David Herbert)
“The foregoing generations beheld God and nature face to face; we, through their eyes. Why should not we also enjoy an original relation to the universe? Why should not we have a poetry and philosophy of insight and not of tradition, and a religion by revelation to us, and not the history of theirs?”
—Ralph Waldo Emerson (18031882)
“Every member of the family of the future will be a producer of some kind and in some degree. The only one who will have the right of exemption will be the mother ...”
—Ruth C. D. Havens, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 13, by Susan B. Anthony and Ida Husted Harper (1902)