History
The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.
The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.
Read more about this topic: Western Kentucky Parkway
Famous quotes containing the word history:
“To summarize the contentions of this paper then. Firstly, the phrase the meaning of a word is a spurious phrase. Secondly and consequently, a re-examination is needed of phrases like the two which I discuss, being a part of the meaning of and having the same meaning. On these matters, dogmatists require prodding: although history indeed suggests that it may sometimes be better to let sleeping dogmatists lie.”
—J.L. (John Langshaw)
“Only the history of free peoples is worth our attention; the history of men under a despotism is merely a collection of anecdotes.”
—Sébastien-Roch Nicolas De Chamfort (17411794)