History
The original segment of the parkway was envisioned as a 127-mile (204 km) toll road extending from Elizabethtown to Princeton. The bonds were issued in 1961 and construction wrapped up on the original 127.19 miles (204.69 km) in December 1963 at a cost of $108,548,062. In 1968, construction wrapped up on a 6.60-mile (10.62 km) extension of the Western Kentucky Parkway from Princeton to Interstate 24 in Eddyville coming in at a cost of $5,554,468. The extension was originally proposed to be 10.30 miles (16.58 km) but only 6.60 miles (10.62 km) were constructed, possibly due to a design realignment of Interstate 24 near Eddyville.
The parkway was originally a toll road, as were all Kentucky parkways. State law requires that toll collection ceases when enough tolls are collected to pay off the parkway's construction bonds; that occurred in 1987. It is constructed similar to the Interstate Highway system, though sections do not measure up to current Interstate standards.
Read more about this topic: Western Kentucky Parkway
Famous quotes containing the word history:
“We are told that men protect us; that they are generous, even chivalric in their protection. Gentlemen, if your protectors were women, and they took all your property and your children, and paid you half as much for your work, though as well or better done than your own, would you think much of the chivalry which permitted you to sit in street-cars and picked up your pocket- handkerchief?”
—Mary B. Clay, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 3, by Susan B. Anthony and Ida Husted Harper (1902)
“The awareness that health is dependent upon habits that we control makes us the first generation in history that to a large extent determines its own destiny.”
—Jimmy Carter (James Earl Carter, Jr.)