Weapon Class Destroyer - Orders and Construction

Orders and Construction

The two ships authorised under the 1942 Programme as the Centaur and Celt of the "CE" class were ordered from Whites of Cowes on 3 February 1942; they were renamed Tomahawk and Sword when the order was altered to the new "Intermediate" design.

The 1943 Programme authorised 17 ships to this design. The first six were ordered on 2 April 1943 - Battleaxe and Broadsword (from Yarrow); Carronade and Claymore (from Scotts); and Crossbow and Culverin (from Thornycroft). The next seven were ordered on 24 April - Cutlass and Dagger (from Yarrow); Dirk, Grenade and Halberd (from Scotts); Howitzer (from Thornycroft); and Musket (from White). A final four were ordered on 27 May - Longbow (from Thornycroft); Poniard (from Scotts); and Rifle and Spear (from Denny).

Three ships were cancelled on 22 November 1944 - Grenade, Halberd and Poniard. Eight more were cancelled on 15 October 1945 - Sword, Claymore, Dagger, Dirk, Howitzer, Longbow, Musket and Spear. Another four were cancelled on 23 December 1945 - Carronade, Culverin, Cutlass and Rifle.

Read more about this topic:  Weapon Class Destroyer

Famous quotes containing the words orders and, orders and/or construction:

    The newspapers, especially those in the East, are amazingly superficial and ... a large number of news gatherers are either cynics at heart or are following the orders and the policies of the owners of their papers.
    Franklin D. Roosevelt (1882–1945)

    There is nothing on earth more exquisite than a bonny book, with well-placed columns of rich black writing in beautiful borders, and illuminated pictures cunningly inset. But nowadays, instead of looking at books, people read them. A book might as well be one of those orders for bacon and bran.
    George Bernard Shaw (1856–1950)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)