Supporting Arguments
Time spent early in the software production cycle can lead to greater economy at later stages. McConnell shows that a bug found in the early stages (such as requirements specification or design) is cheaper in money, effort, and time to fix than the same bug found later on in the process. To take an extreme example, if a program design turns out to be impossible to implement, it is easier to fix the design at the design stage than to realize months later, when program components are being integrated, that all the work done so far has to be scrapped because of a broken design.
This is the central idea behind Big Design Up Front and the waterfall model: time spent early on making sure requirements and design are correct saves much time and effort later. Thus, the thinking of those who follow the waterfall process goes, make sure each phase is 100% complete and absolutely correct before proceeding to the next phase. Program requirements should be set in stone before design begins (otherwise work put into a design based on incorrect requirements is wasted). The program's design should be perfect before people begin to implement the design (otherwise they implement the wrong design and their work is wasted), etc.
A further argument for the waterfall model is that it places emphasis on documentation (such as requirements documents and design documents) as well as source code. In less thoroughly designed and documented methodologies, knowledge is lost if team members leave before the project is completed, and it may be difficult for a project to recover from the loss. If a fully working design document is present (as is the intent of Big Design Up Front and the waterfall model), new team members or even entirely new teams should be able to familiarize themselves by reading the documents.
Some waterfall proponents prefer the waterfall model for its simple approach and argue that it is more disciplined. The waterfall model provides a structured approach; the model itself progresses linearly through discrete, easily understandable and explainable phases and thus is easy to understand; it also provides easily identifiable milestones in the development process. It is perhaps for this reason that the waterfall model is used as a beginning example of a development model in many software engineering texts and courses.
It is argued that the waterfall model and Big Design up Front in general can be suited to software projects that are stable (especially those projects with unchanging requirements, such as with shrink wrap software) and where it is possible and likely that designers will be able to fully predict problem areas of the system and produce a correct design before implementation is started. The waterfall model also requires that implementers follow the well-made, complete design accurately, ensuring that the integration of the system proceeds smoothly.
Read more about this topic: Waterfall Model
Famous quotes containing the words supporting and/or arguments:
“It is handsomer to remain in the establishment better than the establishment, and conduct that in the best manner, than to make a sally against evil by some single improvement, without supporting it by a total regeneration.”
—Ralph Waldo Emerson (18031882)
“Tis happy, therefore, that nature breaks the force of all sceptical arguments in time, and keeps them from having any considerable influence on the understanding. Were we to trust entirely to their self-destruction, that can never take place, till they have first subverted all conviction, and have totally destroyd human reason.”
—David Hume (17111776)