Construction and Controversy
The Virginias were intended, in part, as a cheaper ($1.8 billion vs $2.8 billion) alternative to the Seawolf class submarines, whose production run was stopped after just three boats had been completed. To reduce costs, the Virginia-class submarines use many "commercial off-the-shelf" (or COTS) components, especially in their computers and data networks. In practice, they actually cost less than $1.8 billion (in fiscal year 2009 dollars) each, due to improvements in shipbuilding technology.
In hearings before both House of Representatives and Senate committees, the Congressional Research Service (CRS) and expert witnesses testified that the current procurement plans of the Virginia class – one per year at present, accelerating to two per year beginning in 2012 – would result in high unit costs and (according to some of the witnesses and to some of the committee chairmen) an insufficient number of attack submarines. In a 10 March 2005 statement to the House Armed Services Committee, Ronald O'Rourke of the CRS testified that, assuming the production rate remains as planned, "production economies of scale for submarines would continue to remain limited or poor."
The Virginia class is built through an industrial arrangement designed to keep both GD Electric Boat and Newport News Shipbuilding and Drydock Company (the only two U.S. shipyards capable of building nuclear-powered vessels) in the submarine-building business. Under the present arrangement, the Newport News facility builds the stern, habitability and machinery spaces, torpedo room, sail and bow, while Electric Boat builds the engine room and control room. The facilities alternate work on the reactor plant as well as the final assembly, test, outfit and delivery.
O’Rourke wrote in 2004 that, "Compared to a one-yard strategy, approaches involving two yards may be more expensive but offer potential offsetting benefits." Among the claims of "offsetting benefits" that O'Rourke attributes to supporters of a two-facility construction arrangement is that it "would permit the United States to continue building submarines at one yard even if the other yard is rendered incapable of building submarines permanently or for a sustained period of time by a catastrophic event of some kind", including an enemy attack.
In order to get the submarine's price down to $2 billion per submarine in FY-05 dollars, the Navy instituted a cost-reduction program to shave off approximately $400 million in costs off each submarine's price tag. The project was dubbed "2 for 4 in 12," referring to the Navy's desire to buy two boats for $4 billion in FY-12. Under pressure from Congress, the Navy opted to start buying two boats a year earlier, in FY-11, meaning that officials would not be able to get the $2 billion price tag before the service started buying two submarines per year. However, program manager Dave Johnson said at a conference on 19 March 2008, that the program was only $30 million away from achieving the $2 billion price goal, and would reach that target on schedule.
In December 2008, the Navy signed a $14 billion contract with General Dynamics and Northrop Grumman to supply eight submarines. The contractors will deliver one submarine in each of fiscal 2009 and 2010, and two submarines on each of fiscal 2011, 2012 and 2013. This contract will bring the Navy's Virginia-class fleet to 18 submarines. And in December 2010, the United States Congress passed a defense authorization bill that expanded production to two subs per year. Two submarine-per-year production resumed on 2 September 2011 with commencement of SSN-787 construction.
On 21 June 2008, the Navy christened the New Hampshire (SSN-778), the first Block II submarine. This boat was delivered eight months ahead of schedule and $54 million under budget. Block II boats are built in four sections, compared to the ten sections of the Block I boats. This enables a cost saving of about $300 million per boat, reducing the overall cost to $2 billion per boat and the construction of two new boats per year. Beginning in 2010, new submarines of this class will include a software system that can monitor and reduce their electromagnetic signatures when needed.
In September 2010, it was found that urethane tiles, applied to the hull to damp internal sound and absorb rather than reflect sonar pulses, were falling off while the subs were at sea.
Professor Ross Babbage of the Australian National University has called on Australia to buy or lease a dozen Virginia class submarines from the United States, rather than locally build 12 replacements for its Collins class submarines.
Read more about this topic: Virginia Class Submarine
Famous quotes containing the words construction and/or controversy:
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)
“Ours was a highly activist administration, with a lot of controversy involved ... but Im not sure that it would be inconsistent with my own political nature to do it differently if I had it to do all over again.”
—Jimmy Carter (James Earl Carter, Jr.)