The Validation Process
The validation scope, boundaries and responsibilities for each process or groups of similar processes or similar equipment's must be documented and approved in a validation plan. These documents, terms and references for the protocol authors are for use in setting the scope of their protocols. It must be based on a Validation Risk Assessment (VRA) to ensure that the scope of validation being authorised is appropriate for the complexity and importance of the equipment or process under validation. Within the references given in the VP the protocol authors must ensure that all aspects of the process or equipment under qualification; that may affect the efficacy, quality and or records of the product are properly qualified. Qualification includes the following steps:
- Design qualification (DQ)- Demonstrates that the proposed design (or the existing design for an off-the-shelf item) will satisfy all the requirements that are defined and detailed in the User Requirements Specification (URS). Satisfactory execution of the DQ is a mandatory requirement before construction (or procurement) of the new design can be authorised.
- Installation qualification (IQ) – Demonstrates that the process or equipment meets all specifications, is installed correctly, and all required components and documentation needed for continued operation are installed and in place.
- Operational qualification (OQ) – Demonstrates that all facets of the process or equipment are operating correctly.
- Performance qualification (PQ) – Demonstrates that the process or equipment performs as intended in a consistent manner over time.
- Component qualification (CQ) – is a relatively new term developed in 2005. This term refers to the manufacturing of auxiliary components to ensure that they are manufactured to the correct design criteria. This could include packaging components such as folding cartons, shipping cases, labels or even phase change material. All of these components must have some type of random inspection to ensure that the third party manufacturer's process is consistently producing components that are used in the world of GMP at drug or biologic manufacturer.
There are instancies when it is more expedient and efficient to transfer some tests or inspections from the IQ to the OQ, or from the OQ to the PQ. This is allowed for in the regulations, provided that a clear and approved justification is documented in the Validation Plan (VP).
This combined testing of OQ and PQ phases is sanctioned by the European Commission Enterprise Directorate-General within ‘Annex 15 to the EU Guide to Good Manufacturing Practice guide’ (2001, p. 6) which states that:
"Although PQ is described as a separate activity, it may in some cases be appropriate to perform it in conjunction with OQ."
Read more about this topic: Validation (drug Manufacture)
Famous quotes containing the word process:
“At the heart of the educational process lies the child. No advances in policy, no acquisition of new equipment have their desired effect unless they are in harmony with the child, unless they are fundamentally acceptable to him.”
—Central Advisory Council for Education. Children and Their Primary Schools (Plowden Report)