Design and Construction

Roosevelt and those Nimitz-class vessels completed after her have slight structural differences from the earlier carriers (Nimitz and Eisenhower), and improved protection for ordnance storage in her magazines.

TR's history began on 30 September 1980, when a contract was awarded for "Hull 624D" to Newport News Shipbuilding.

Her keel was laid down on 31 October 1981, with Secretary of Defense Caspar Weinberger initiating the first weld. On 3 November 1981, Secretary of the Navy John F. Lehman announced that the carrier would be named for the 26th President of the United States, Theodore Roosevelt.

TR was the first aircraft carrier to be assembled using modular construction, wherein large modules are independently constructed in "lay-down" areas, prior to being hoisted into place and welded together. Modular construction, made possible through the use of a huge gantry crane capable of lifting 900 tons, cut 16 months off TR's construction time, and the technique has been used on every aircraft carrier since.

The Navy's Pre Commissioning Unit (PCU) was formed in February 1984, with Captain Paul W. Parcells named the Commanding Officer.

On 27 October 1984 the ship was officially christened by Mrs. Barbara Lehman, wife of Secretary Lehman. On 25 October 1986, Theodore Roosevelt was commissioned to active service at Newport News.

Read more about this topic:  USS Theodore Roosevelt (CVN-71)

Famous quotes containing the words design and/or construction:

    Teaching is the perpetual end and office of all things. Teaching, instruction is the main design that shines through the sky and earth.
    Ralph Waldo Emerson (1803–1882)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)