1960s
During her shakedown cruise in August 1959, she became the first nuclear ship to pass through the Straits of Gibraltar and operate in the Mediterranean. Following post-shakedown availability at Groton, Connecticut, the nuclear submarine conducted type training and participated in an advanced Atlantic submarine exercise from May through July 1960, which earned the submarine a Navy Unit Commendation, and also a Battle Efficiency "E" award, an award it would receive three more times.
In late 1960, Skipjack entered the mouth of a long ship channel leading from the Arctic Ocean to Murmansk in the Soviet Union. On the journey, she passed so close to the Soviet port that the officers could look through a periscope and see the port only 30 or 40 yards (27 to 37 meters) away. Upon entering the canal, crewmen saw one of Skipjack's officers turn off a tracing mechanism so that there would be no written record of the action. Upon returning from this mission, Skipjack spent the remainder of 1960 in a restricted yard availability and upkeep.
Skipjack commenced her 1961 operations by participating in two weeks of type training followed by anti-submarine warfare exercises through August, visiting Mayport, Florida, before returning to Groton.
In January 1962, Skipjack operated out of Key West, Florida, for two weeks before entering the Portsmouth Naval Shipyard in Maine for extensive overhaul, lasting four and one-half months. Following her return to New London, Connecticut, the submarine operated locally prior to departing in October for duty in the Mediterranean with the Sixth Fleet. During this tour, Skipjack participated in various fleet and NATO exercises and visited Toulon, France; and La Spezia and Naples, Italy, before returning to New London. In this year, the Skipjack also conducted the fastest submerged transit of the Atlantic Ocean on record, which is a record that still stands.
The year 1963 was occupied in submarine attack operations and ASW exercises, all designed to test the capabilities of the nuclear-powered attack submarine. The highlight of 1964 was two months of duty with NATO forces, participating in exercises "Masterstroke" and "Teamwork" and visiting Le Havre, France, and the Isle of Portland, England, before returning to New London in October.
After devoting most of 1965 to training exercises, the submarine ended the year by entering the Charleston Naval Shipyard in South Carolina for an overhaul that lasted until 18 October 1966. Skipjack then got underway for sea trials off Charleston, before joining Shark for four days of type training in the Jacksonville, Florida, area. She then sailed to her new home port, Norfolk, Virginia, before participating in Atlantic Fleet exercises.
Early in February 1967, Skipjack got underway for sonar and weapon tests and then participated in Atlantic submarine exercises from March through June. July and August were spent in restricted availability at the Newport News Shipbuilding and Dry Dock Company following which Skipjack took part in FIXWEX G-67, an exercise designed to evaluate fixed wing ASW aircraft against a submarine with Skipjack's characteristics. Following an extended deployment in October and November, the submarine returned to Norfolk to prepare for major operations of that year which she completed on 25 February 1968. The remainder of 1968 was spent in local operations in the Norfolk area.
On 9 April 1969, Skipjack commenced an overhaul in the Norfolk Naval Shipyard which was completed in the fall of 1970. After sea trials in December 1970, Skipjack returned to her regular duties.
Read more about this topic: USS Skipjack (SSN-585)