USS Skate (SSN-578)
USS Skate (SSN-578), the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines. She was the third nuclear submarine commissioned, the first to make a completely submerged trans-Atlantic crossing, and the second submarine to reach the North Pole and the first to surface there.
The contract to build her was awarded to the Electric Boat division of General Dynamics on 18 July 1955, and her keel was laid in Groton, Connecticut on 21 July 1955. She was launched on 16 May 1957 sponsored by Mrs. Lewis L. Strauss, and commissioned on 23 December 1957 with Commander James F. Calvert in command.
Read more about USS Skate (SSN-578): Operational History, Decommissioning, Awards, Popular Culture