USS Saratoga (CV-60) - Construction and Trials

Construction and Trials

She was ordered as a "Large Aircraft Carrier", hull classification symbol CVB-60, and her contract was awarded to the New York Naval Shipyard of Brooklyn, New York on 23 July 1952. She is the second of the four Forrestal-class carriers. She was reclassified as an "Attack Aircraft Carrier" (CVA-60) on 1 October 1952. Her keel was laid down on 16 December 1952. She was launched on 8 October 1955 sponsored by Mrs. Charles S. Thomas, and commissioned on 14 April 1956 with Captain Robert Joseph Stroh in command. She was the first carrier in the US Navy to use high-pressure (1200 psi) boilers.

Read more about this topic:  USS Saratoga (CV-60)

Famous quotes containing the words construction and/or trials:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    It is time to provide a smashing answer for those cynical men who say that a democracy cannot be honest, cannot be efficient.... We have in the darkest moments of our national trials retained our faith in our own ability to master our own destiny.
    Franklin D. Roosevelt (1882–1945)