USS Oriskany (CV-34) - Construction and Commissioning

Construction and Commissioning

The name "Oriskany" was originally assigned to CV-18, but that hull was renamed Wasp when the keel was laid in 1942. CV-34 was laid down on 1 May 1944 by the New York Naval Shipyard, launched on 13 October 1945, and sponsored by Mrs. Clarence Cannon. Construction was suspended on 12 August 1947, when the ship was approximately 85% complete. Oriskany was redesigned as the prototype for the SCB-27 modernization program. To handle the new generation of carrier aircraft, the flight deck structure was massively reinforced. Stronger elevators, more powerful hydraulic catapults, and new arresting gear were installed. The island structure was rebuilt, the anti-aircraft turrets were removed, and blisters were added to the hull. Blistering the hull (also known as adding bulges) increases the cross-sectional area of a ship's hull, thereby increasing its buoyancy and stability. It also provides increased bunker volume. In the case of the Oriskany, this would have been for aviation fuel. These features would have been crucial to a ship that had so much topside weight added after its original design. Oriskany was commissioned in the New York Naval Shipyard on 25 September 1950, Captain Percy H. Lyon in command.

Read more about this topic:  USS Oriskany (CV-34)

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)