Construction and Commissioning
The contract to build Nevada was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 7 January 1981 and her keel was laid down there on 8 August 1983. She was launched on 14 September 1985 sponsored by Mrs. Carol Laxalt, the wife of United States Senator Paul Laxalt of Nevada, and commissioned on 16 August 1986, with Captain F.W. Rohm in command of the Blue Crew and Captain William Stone in command of the Gold Crew.
Read more about this topic: USS Nevada (SSBN-733)
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)