Construction and Commissioning
Michigan was constructed at the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut and was commissioned on 11 September 1982. Michigan arrived in Bangor, Washington on 16 March 1983 and completed sixty-six Strategic Deterrent Patrols.
Read more about this topic: USS Michigan (SSGN-727)
Famous quotes containing the word construction:
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)