Construction and Commissioning
The contract to build Kamehameha was awarded to Mare Island Naval Shipyard at Vallejo, California, on 31 August 1962 and her keel was laid down there on 2 May 1963. She was launched on 16 January 1965, sponsored by Mrs. Samuel Wilder King, and commissioned on 10 December 1965 with Commander Roth S. Leddick in command of the Blue Crew and Commander Robert W. Dickieson in command of the Gold Crew.
Conducting deterrence patrols during the Cold War, Kamehameha's armament as a ballistic missile submarine was 16 Poseidon ballistic missiles plus ten to twelve Mark 48 heavy torpedoes non-ADCAP (advanced capability).
Read more about this topic: USS Kamehameha (SSBN-642)
Famous quotes containing the word construction:
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)