USS James Madison (SSBN-627) - Operational History

Operational History

After post-shakedown repairs and modification in November and December 1964, James Madison departed on her first deterrent patrol on 17 January 1965. By the end of 1966, she had completed her 10th deterrent patrol, serving in the European area.

During her first major overhaul, like the rest of her class, Madison was retrofitted with Poseidon C-3 missiles and their associated Mark 88 firecontrol system. Poseidon was replaced by Trident C-4 missiles during a comprehensive overhaul that took place at the Newport News (VA) Shipyard in the early 1980s.

Read more about this topic:  USS James Madison (SSBN-627)

Famous quotes containing the word history:

    When we of the so-called better classes are scared as men were never scared in history at material ugliness and hardship; when we put off marriage until our house can be artistic, and quake at the thought of having a child without a bank-account and doomed to manual labor, it is time for thinking men to protest against so unmanly and irreligious a state of opinion.
    William James (1842–1910)