USS Galveston (CL-93) - 1961

1961

On 6 January 1961, Galveston departed Norfolk for more Bureau of Naval Weapons technical evaluation of her Talos missile systems, including tests of the IV Talos, its capabilities and potentials, in areas off Jacksonville, Fla., Puerto Rico and the Virgin Islands. These evaluations completed 1 March, she departed San Juan for refresher training and her final acceptance trial out of Guantanamo Bay. The cruiser returned to Norfolk on 9 April, but soon steamed to Jacksonville, Fla., where on 8 May she began duty under the Operational Technical Evaluation Force that included extensive testing of her missile system and many Talos firings. The effectiveness of the system and the weapon were demonstrated by a new, long-range record as well as a successful two-missile salvo shot. The Talos missile cruiser entertained over 17,000 visitors at Cape Canaveral on the Armed Forces weekend celebration in May; completed later phases of her evaluation exercises in the Caribbean through 21 July 1960; then visited Bayonne, N.J., where her missile fire-control radars were removed in preparation for overhaul. Galveston was overhauled in the Philadelphia Naval Shipyard (30 August 1961 – 23 July 1962). This overhaul included modifications to the fire control system of the Talos missile.

The visit to Charleston was for electronic equipment repair. She had to go in at low tide, and lightning rods had to be lowered to pass under the Charleston bridge.

Read more about this topic:  USS Galveston (CL-93)