Construction and Commissioning
The contract to build Flying Fish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 30 June 1967. She was launched on 17 May 1969, sponsored by Mrs. John W. Harvey, and commissioned on 29 April 1970 with Commander Donald C. Shelton in command.
Read more about this topic: USS Flying Fish (SSN-673)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)