Construction and Commissioning
The contract to build Flying Fish was awarded to the Electric Boat Division of General Dynamics Corporation in Groton, Connecticut, on 15 July 1966 and her keel was laid down there on 30 June 1967. She was launched on 17 May 1969, sponsored by Mrs. John W. Harvey, and commissioned on 29 April 1970 with Commander Donald C. Shelton in command.
Read more about this topic: USS Flying Fish (SSN-673)
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face.”
—William Shakespeare (15641616)