USS Boxer (CV-21) - Construction

Construction

Boxer was one of 24 Essex-class ships to be completed, among the largest and most numerous capital ships produced for World War II. She was ordered in 1943.

The ship was one of the "long-hull" designs of the class, which had begun production after March 1943. This "long hull" variant involved lengthening the bow above the waterline into a "clipper" form. The increased rake and flare provided deck space for two quadruple 40mm mounts; these units also had the flight deck slightly shortened forward to provide better arcs of fire. Of the Essex-class ships laid down after 1942, only USS Bon Homme Richard (CV-31) followed the original "short bow" design. The later ships have been variously referred to as the "long-bow units", the "long-hull group", or the "Ticonderoga class". However, the U.S. Navy never maintained any institutional distinction between the long-hull and short-hull members of the Essex class, and postwar refits and upgrades were applied to both groups equally.

Like other "long-hull" Essex-class carriers, Boxer had a displacement of 27,100 tonnes (26,700 long tons; 29,900 short tons). She had an overall length of 888 feet (271 m), a beam of 93 feet (28 m) and a draft of 28 feet (8.5 m). The ship was powered by eight 600 psi Babcock & Wilcox boilers, and Westinghouse geared steam turbines that developed 150,000 shaft horsepower that turned four propellers. Like other Essex-class carriers, she had a maximum speed of 33 knots (61 km/h; 38 mph). The ship had a total crew complement of 3,448. Like other Essex-class ships, she could be armed with 12 5-inch (127 mm)/38 caliber guns arrayed in four pairs and four single emplacements, as well as 8 quadruple Bofors 40 mm guns and 46 Oerlikon 20 mm cannons. However, unlike her sisters, Boxer was armed instead with 72 40mm guns and 35 20 mm cannons.

Her keel was laid on 13 September 1943 by the Newport News Shipbuilding Company at its facility in Newport, Virginia. She was the fifth ship of the US Navy to be named Boxer, after HMS Boxer, which had been captured by the U.S. during the War of 1812. The last ship to bear the name had been a training ship in 1905. The new carrier was launched on 14 December 1944 and she was christened by Ruth D. Overton, the daughter of U.S. Senator John H. Overton. The ship's cost is estimated at $68,000,000 to $78,000,000.

Read more about this topic:  USS Boxer (CV-21)

Famous quotes containing the word construction:

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)