USS America (CV-66) - Construction and Shakedown

Construction and Shakedown

Originally ordered as an Enterprise-class nuclear carrier, the ballooning costs of Enterprise during construction caused the cancellation of the nuclear CVAN-66 and her reordering as a conventionally-powered Kitty Hawk-class carrier. She was laid down on 1 January 1961 at Newport News, Virginia, by the Newport News Shipbuilding and Dry Dock Corp.; launched on 1 February 1964, sponsored by Mrs. David L. McDonald, wife of Admiral David L. McDonald, the Chief of Naval Operations; and commissioned at the Norfolk Naval Shipyard on 23 January 1965, Captain Lawrence Heyworth, Jr., in command.

After fitting out there until 15 March 1965, America remained in Hampton Roads for operations off the Virginia Capes until getting underway on 25 March. She conducted her first catapult launch on 5 April 1965, with Commander Kenneth B. Austin, the carrier's executive officer, piloting a Douglas A-4C Skyhawk. Proceeding thence to the Caribbean, the carrier conducted shakedown training and concluded it at Guantanamo Bay on 23 June.

Entering the Norfolk shipyard for post-shakedown availability on 10 July, she remained there until 21 August. She next operated locally through late August and then proceeded to the operating areas off the Virginia Capes and to Bermuda, arriving back at Norfolk on 9 September. On 25 September, Rear Admiral J. O. Cobb broke his flag as Commander, Carrier Division 2 (CarDiv 2).

Read more about this topic:  USS America (CV-66)

Famous quotes containing the word construction:

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)