USS Albacore (SS-218)

USS Albacore (SS-218)


For other ships of the same name, see USS Albacore.

USS Albacore in Measure 9 camouflage (dull black) off Groton, 9 May 1942
Career (United States)
Builder: General Dynamics Electric Boat, Groton, Connecticut
Laid down: 21 April 1941
Launched: 17 February 1942
Sponsored by: Mrs. Elwin F. Cutts
Commissioned: 1 June 1942
Fate: Probably mined off of northern Hokkaidō, 7 November 1944
General characteristics
Class & type: Gato-class diesel-electric submarine
Displacement: 1,525 long tons (1,549 t) surfaced, 2,424 long tons (2,463 t) submerged
Length: 311 ft 9 in (95.02 m)
Beam: 27 ft 3 in (8.31 m)
Draft: 17 ft (5.2 m) maximum
Propulsion:

4 × General Motors Model 16-248 V16 diesel engines driving electrical generators
2 × 126-cell Sargo batteries
4 × high-speed General Electric electric motors with reduction gears
two propellers
5,400 shp (4.0 MW) surfaced

2,740 shp (2.0 MW) submerged
Speed: 21 knots (39 km/h) surfaced; 9 kn (17 km/h) submerged
Range: 11,000 nautical miles (20,000 km) surfaced @ 10 kn (19 km/h)
Endurance: 48 hours at 2 kn (4 km/h) submerged, 75 days on patrol
Test depth: 300 ft (90 m)
Complement: 6 officers, 54 enlisted
Armament: 10 × 21-inch (533 mm) torpedo tubes
(six forward, four aft)
24 torpedoes
1 × 3-inch (76 mm) / 50 caliber deck gun
Bofors 40 mm and Oerlikon 20 mm cannon

USS Albacore (SS-218) was a Gato-class submarine which served in the Pacific Theater of Operations during World War II, winning four Presidential Unit Citations and nine battle stars for her service. During the war, she was credited with sinking 13 Japanese ships (including two destroyers, a light cruiser, and the aircraft carrier Taihō) and damaging another five; not all of these credits were confirmed by postwar JANAC accounting. She also holds the distinction of sinking the most warship tonnage of any U.S. submarine.

Albacore was the second vessel of the United States Navy to be named for the albacore. Her keel was laid on 21 April 1941 by the Electric Boat Company in Groton, Connecticut. She was launched on 17 February 1942 (sponsored by Mrs. Elwin F. Cutts, the wife of Captain Cutts), and commissioned on 1 June 1942, Lieutenant Commander Richard C. Lake (Class of 1929) in command.

Read more about USS Albacore (SS-218):  Awards