USS Alabama (SSBN-731) - Construction and Commissioning

Construction and Commissioning

The contract for Alabama's construction was awarded on 27 February 1978 and her keel was laid down on 14 October 1980 at Groton, Connecticut, by the Electric Boat Division of General Dynamics. She was launched on 19 May 1984, sponsored by Mrs. Barbara E. Dickinson, wife of William Louis Dickinson, Representative from Alabama, and commissioned at Naval Submarine Base New London at New London, Connecticut, on 25 May 1985.

Read more about this topic:  USS Alabama (SSBN-731)

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)