Future
Considered an important link between Fayetteville, Lillington and Raleigh, NCDOT has setup the US 401 Corridor Study. The purpose of the study is to identify deficiencies in the existing corridor and develop alternatives for accommodating future growth in traffic volumes (i.e. widen to multi-lanes). The corridor study also includes NC 55 and NC 210. Estimated costs for all road improvements along the corridor is around $193–222.6 million. Property acquisition and construction is unfunded at this time.
Read more about this topic: U.S. Route 401
Famous quotes containing the word future:
“But what we strive to gratify, though we may call it a distant hope, is an immediate desire; the future estate for which men drudge up city alleys exists already in their imagination and love.”
—George Eliot [Mary Ann (or Marian)
“The future is ever a misted landscape, no man foreknows it, but at
cyclical turns
There is a change felt in the rhythm of events:”
—Robinson Jeffers (18871962)
“The ellipse is as aimless as that,
Stretching invisibly into the future so as to reappear
In our present. Its flexing is its account,
Return to the point of no return.”
—John Ashbery (b. 1927)