Future
Considered an important link between Fayetteville, Lillington and Raleigh, NCDOT has setup the US 401 Corridor Study. The purpose of the study is to identify deficiencies in the existing corridor and develop alternatives for accommodating future growth in traffic volumes (i.e. widen to multi-lanes). The corridor study also includes NC 55 and NC 210. Estimated costs for all road improvements along the corridor is around $193–222.6 million. Property acquisition and construction is unfunded at this time.
Read more about this topic: U.S. Route 401
Famous quotes containing the word future:
“The future is ever a misted landscape, no man foreknows it, but at
cyclical turns
There is a change felt in the rhythm of events:”
—Robinson Jeffers (18871962)
“The circuited city of the future will not be the huge hunk of concentrated real estate created by the railway. It will take on a totally new meaning under conditions of very rapid movement. It will be an information megalopolis.”
—Marshall McLuhan (19111980)
“We live in an age when to be young and to be indifferent can be no longer synonymous. We must prepare for the coming hour. The claims of the Future are represented by suffering millions; and the Youth of a Nation are the trustees of Posterity.”
—Benjamin Disraeli (18041881)