U.S. Route 401 - Future

Future

Considered an important link between Fayetteville, Lillington and Raleigh, NCDOT has setup the US 401 Corridor Study. The purpose of the study is to identify deficiencies in the existing corridor and develop alternatives for accommodating future growth in traffic volumes (i.e. widen to multi-lanes). The corridor study also includes NC 55 and NC 210. Estimated costs for all road improvements along the corridor is around $193–222.6 million. Property acquisition and construction is unfunded at this time.

Read more about this topic:  U.S. Route 401