U.S. Route 401 - Future

Future

Considered an important link between Fayetteville, Lillington and Raleigh, NCDOT has setup the US 401 Corridor Study. The purpose of the study is to identify deficiencies in the existing corridor and develop alternatives for accommodating future growth in traffic volumes (i.e. widen to multi-lanes). The corridor study also includes NC 55 and NC 210. Estimated costs for all road improvements along the corridor is around $193–222.6 million. Property acquisition and construction is unfunded at this time.

Read more about this topic:  U.S. Route 401

Famous quotes containing the word future:

    “We accept and welcome ... as conditions to which we must accommodate ourselves, great inequality of environment; the concentration of business, industrial and commercial, in the hands of a few; and the law of competition between these, as being not only beneficial, but essential for the future progress of the race.”
    —Andrew Carnegie (1835–1919)

    “I imagine, on the benches of an assembly, the most intrepid of thinkers, a brilliant mind, one of those men who, when they ascend the tribune, feel it beneath them like the tripod of the oracle, suddenly grow in stature and become colossal, surpass by a head the massive appearances that mask reality, and see clearly the future over the high, frowning wall of the present.”
    —Victor Hugo (1802–1885)

    “If Germany, thanks to Hitler and his successors, were to enslave the European nations and destroy most of the treasures of their past, future historians would certainly pronounce that she had civilized Europe.”
    —Simone Weil (1909–1943)