High School Construction Project
After months of deliberations, the school board decided to move forward and proposed to rebuild the high school. On March 20, 2007, the voters in Upper Dublin were presented with a referendum. They approved, despite the risk of a significant tax increase. Initial estimates of the new construction is $119 million. The construction will occur in stages on the site of the current building. It is expected to be completed by 2012. Demolition of the oldest wing began in summer 2008.
Read more about this topic: Upper Dublin High School
Famous quotes containing the words high, school, construction and/or project:
“As I walked on the glacis I heard the sound of a bagpipe from the soldiers dwellings in the rock, and was further soothed and affected by the sight of a soldiers cat walking up a cleated plank in a high loophole designed for mus-catry, as serene as Wisdom herself, and with a gracefully waving motion of her tail, as if her ways were ways of pleasantness and all her paths were peace.”
—Henry David Thoreau (18171862)
“It was Mabbie without the grammar school gates.
And Mabbie was all of seven.
And Mabbie was cut from a chocolate bar.
And Mabbie thought life was heaven.”
—Gwendolyn Brooks (b. 1917)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“She cannot love,
Nor take no shape nor project of affection,
She is so self-endeared.”
—William Shakespeare (15641616)