Program Cost
In 1990, the Titan IV Selected Acquisition Report estimated the total cost for the acquisition of 65 Titan IV vehicles over a period of 16 years to US$ 18.3 billion (inflation adjusted US$ 32.6 billion in 2012).. The last titan 401a launch that exploded cost 1.3 billion dollars.
Read more about this topic: Titan IV
Famous quotes containing the words program and/or cost:
“In 1869 he started his work for temperance instigated by three drunken men who came to his home with a paper signed by a saloonkeeper and his patrons on which was written For Gods sake organize a temperance society.”
—Federal Writers Project Of The Wor, U.S. public relief program (1935-1943)
“The cost of a thing is the amount of what I will call life which is required to be exchanged for it, immediately or in the long run.”
—Henry David Thoreau (18171862)