Program Cost
In 1990, the Titan IV Selected Acquisition Report estimated the total cost for the acquisition of 65 Titan IV vehicles over a period of 16 years to US$ 18.3 billion (inflation adjusted US$ 32.6 billion in 2012).. The last titan 401a launch that exploded cost 1.3 billion dollars.
Read more about this topic: Titan IV
Famous quotes containing the words program and/or cost:
“The blacksmith dropped his hammer, the carpenter his plane, the mason his trowel, the farmer his sickle, the baker his loaf, and the tapster his bottle. All were off for the mines, some on horses, some on carts, and some on crutches, and one went in a litter.”
—For the State of California, U.S. public relief program (1935-1943)
“[M]y conception of liberty does not permit an individual citizen or a group of citizens to commit acts of depredation against nature in such a way as to harm their neighbors and especially to harm the future generations of Americans. If many years ago we had had the necessary knowledge, and especially the necessary willingness on the part of the Federal Government, we would have saved a sum, a sum of money which has cost the taxpayers of America two billion dollars.”
—Franklin D. Roosevelt (18821945)