A major revision of the line from Lester to Stampede Tunnel was undertaken between 1912 and 1915. This included a new roundhouse at Lester, double tracking the line from Lester to the west portal of Tunnel 4, a small tunnel just a mile west of Stampede Tunnel, and replacing the former loop through Weston, Washington, with a large steel viaduct. At the same time the route from Martin, at the east portal of Stampede Tunnel, was double tracked down to Easton, Washington.

In August, 1984 the Burlington Northern Railroad mothballed the line as redundant. Between 1995 and 1996 Burlington Northern, and its corporate descendant, the BNSF Railway, rehabilitated the line as a response to increasing traffic pressures in the Pacific Northwest. As of 2007, BNSF and government agencies in Washington state are committed to enlarging Stampede Tunnel to accommodate larger intermodal freight cars. The current tunnel is not high enough for double stacked intermodal cars.

Read more about this topic:  Stampede Pass

Famous quotes containing the words double and/or tracking:

    [The] elderly and timid single gentleman in Paris ... never drove down the Champs Elysees without expecting an accident, and commonly witnessing one; or found himself in the neighborhood of an official without calculating the chances of a bomb. So long as the rates of progress held good, these bombs would double in force and number every ten years.
    Henry Brooks Adams (1838–1918)

    Such is the art of writing as Dreiser understands it and practices it—an endless piling up of minutiae, an almost ferocious tracking down of ions, electrons and molecules, an unshakable determination to tell it all. One is amazed by the mole-like diligence of the man, and no less by his exasperating disregard for the ease of his readers.
    —H.L. (Henry Lewis)