San Francisco Bay - Bay Fill and Depth Profile

Bay Fill and Depth Profile

San Francisco Bay's profile changed dramatically in the late 19th century and again with the initiation of dredging by the US Army Corps of Engineers in the 20th century. Before about 1860, most bay shores (exception: rocky shores such as those in Carquinez Strait, along Marin shoreline, Point Richmond, Golden Gate area) contained extensive wetlands that graded nearly invisibly from freshwater wetlands to salt marsh and then tidal mudflat. A deep channel ran through the center of the bay, following the ancient drowned river valley.

In the 1860s and continuing into the early 20th century, miners dumped staggering quantities of mud and gravel from hydraulic mining operations into the upper Sacramento and San Joaquin Rivers. GK Gilbert's estimates of debris total more than eight times the amount of rock and dirt moved during construction of the Panama Canal. This material flowed down the rivers, progressively eroding into finer and finer sediment, until it reached the bay system. Here some of it settled, eventually filling in Suisun Bay, San Pablo Bay, and San Francisco Bay, in decreasing order of severity.

By the end of the 19th century, these "slickens" had filled in much of the shallow bay flats, raising the entire bay profile. New marshes were created in some areas.

In the last years of the nineteenth- and first decades of the twentieth-centuries, at the behest of local political officials and following Congressional orders, the US Army Corps began dredging the Sacramento and San Joaquin Rivers and the deep channels of San Francisco Bay. This work has continued without interruption ever since, an enormous federal subsidy of San Francisco Bay shipping. Some of the dredge spoils were initially dumped in the bay shallows (including helping to create Treasure Island on the former shoals to the north of Yerba Buena Island) and used to raise an island in the Sacramento-San Joaquin Delta. The net effect of dredging has been to maintain a narrow deep channel—deeper perhaps than the original bay channel—through a much shallower bay. At the same time, most of the marsh areas have been filled or blocked off from the bay by dikes.

Large ships transiting the bay must follow deep underwater channels that are maintained by frequent dredging as the average depth of the Bay is only as deep as a swimming pool--approximately 12 to 15 ft (3.7 to 4.6 m). Between Hayward and San Mateo to San Jose it is 12 to 36 in (300 to 910 mm). The deepest part of the bay is under and out of the Golden Gate Bridge, at 372 ft (113 m).

In the late 1990s, a 12-year harbor-deepening project for the Port of Oakland began; it was largely completed by September 2009. Previously, the bay waters and harbor facilities only allowed for ships with a draft of 46 ft (14 m), but dredging activities undertaken by the United States Army Corps of Engineers in partnership with the Port of Oakland succeeded in providing access for vessels with a 50-foot (15 m) draft. Four dredging companies were employed in the $432 million project, with $244 million paid for with federal funds and $188 million supplied by the Port of Oakland. Some 6,000,000 cubic yards (4,600,000 m3) of mud from the dredging was deposited at the western edge of Middle Harbor Shoreline Park to become a 188-acre (76 ha) shallow-water wetlands habitat for marine and shore life. Further dredging followed in 2011, to maintain the navigation channel. This dredging enabled the arrival of the largest container ship ever to enter the San Francisco Bay, the MSC Fabiola. Bay pilots trained for the visit on a simulator at the California Maritime Academy for over a year. The ship arrived drawing less than its full draft of 50 feet 10 inches (15.5 m) because it held only three-quarters of a load after its stop in Long Beach.

Read more about this topic:  San Francisco Bay

Famous quotes containing the words bay, fill, depth and/or profile:

    Three miles long and two streets wide, the town curls around the bay ... a gaudy run with Mediterranean splashes of color, crowded steep-pitched roofs, fishing piers and fishing boats whose stench of mackerel and gasoline is as aphrodisiac to the sensuous nose as the clean bar-whisky smell of a nightclub where call girls congregate.
    Norman Mailer (b. 1923)

    When Nature was shaping him, clay was not granted
    For making so full-sized a man as she wanted,
    So, to fill out her model, a little she spared
    From some finer-grained stuff for a woman prepared,
    And she could not have hit a more excellent plan
    For making him fully and perfectly man.
    James Russell Lowell (1819–1891)

    Love and work are viewed and experienced as totally separate activities motivated by separate needs. Yet, when we think about it, our common sense tells us that our most inspired, creative acts are deeply tied to our need to love and that, when we lack love, we find it difficult to work creatively; that work without love is dead, mechanical, sheer competence without vitality, that love without work grows boring, monotonous, lacks depth and passion.
    Marta Zahaykevich, Ucranian born-U.S. psychitrist. “Critical Perspectives on Adult Women’s Development,” (1980)

    Actor: Electrician, a little more this way with that spotlight. What are you trying to do, ruin my profile?
    Electrician: Your profile was ruined the day you were born.
    James Gleason (1886–1959)