Rural Electrification Act - Technical Issues

Technical Issues

In the 1930s, the provision of power to remote areas was not thought to be economically feasible. A 2300 volt distribution system was then used in cities. This relatively low voltage could only be carried about 4 miles before the voltage drop became unacceptable.

REA cooperatives used a 6900 volt distribution network, which could support much longer runs (up to about 40 miles). Despite requiring more expensive transformers at each home, the overall system cost was manageable.