2860's Return To Steam
On 28 September 2006, the Royal Hudson steamed into the WCRA Squamish station under her own power for the first time since October 1999. The restoration took just over one year with a cost of over $250,000. Money for the restoration was provided wholly by donations. The WCRA also had difficulty locating missing parts. Some of the major components, such as the trailing truck, were borrowed from sister engine 2850. The borrowed parts had to be returned when 2850 was put on public display. WCRA replaced the borrowed tailing truck with one that was being used at a mine, which had salvaged the truck from a Royal Hudson due for scrap. The truck turned out to have been taken off of 2860 when she was sitting on the scrap line in the 1960s. The association plans to operate 2860 on excursion runs and at special events. Due to the strict "no steam" policy that CP and CN have, the excursions are restricted to special occasions only. 2860 is steamed up regularly for publicity and to salute passing passenger trains.
On 9 December 2010, the ex-CP 2860 and the Royal Hudson trainset were scheduled to depart North Vancouver for Squamish at 12:30 pm on the last of its scheduled excursion trips in 2010. The ex-CP 2860's certification expired in January 2011 and the cost of the necessary work is estimated at over $1 million CAD. The December 9 trip is likely to be her last for a long time.
Read more about this topic: Royal Hudson
Famous quotes containing the words return and/or steam:
“The return to solid values is always hard.... Distress, panic, and hard times have marked our pathway in returning to solid values.”
—James A. Garfield (18311881)
“Clean the spittoons.
The steam in hotel kitchens,
And the smoke in hotel lobbies,
And the slime in hotel spittoons:
Part of my life.”
—Langston Hughes (19021967)