Future
There are currently several major projects underway that will see upgrades to RAN capabilities:
- Project AIR 9000 Phase 8 is a project to replace the RAN's Seahawk (and cancelled Kaman SH-2G(A) Super Seasprite) helicopters with 24 MH-60R Seahawk helicopters.
- Project JP 2048 Phases 4A and 4B is a project to build two Canberra-class Landing Helicopter Dock (LHD) amphibious ships (based on the Spanish Buque de Proyección Estratégica). These will be the largest RAN warships ever commissioned and will replace HMAS Tobruk and a Kanimbla-class vessel. The project is on schedule for the vessels to be accepted in January 2014 (HMAS Canberra) and August 2015 (HMAS Adelaide).
- Project JP 2048 Phase 3 will provide six Heavy Landing Craft to replace the RAN's Balikpapan-class vessels. The project is planned to deliver capability in 2014–2016.
- Project SEA 1390 Phase 2.1 will see the upgrading of four Adelaide-class guided missile frigates with enhanced weapons and electronics.
- Project SEA 1429 will upgrade the Collins-class submarines with state-of-the-art heavyweight torpedoes.
- Project SEA 1439 Phase 4A will equip the Collins-class submarines with a new tactical combat system.
- Project SEA 1654 Phase 3 is a project to acquire a Sea Logistic Support and Replenishment Support vessel to replace the supply ship HMAS Success.
- Project SEA 4000, under which the RAN will acquire three Hobart-class Air Warfare Destroyers, built around the United States Navy Aegis air and surface combat management system. The vessels are be based on the Spanish Álvaro de Bazán-class frigate. The project is on schedule to deliver the first ship, HMAS Hobart, in December 2014. HMAS Brisbane and HMAS Sydney are due to be delivered in March 2016 and June 2017 respectively.
To boost the RAN's amphibious capability until the arrival of the Canberra-class LHDs, the RAN acquired HMAS Choules (a former Bay class landing ship of the British Royal Fleet Auxiliary) in December 2011, and the support vessel ADV Ocean Shield in June 2012.
Future procurement plans include:
- twelve Future Submarines, under Project SEA 1000, to replace the Collins-class (up to 4,000 tons, equipped with cruise missiles and minisubs);
- eight Future Frigates to replace the Anzac-class frigates (possibly up to 7,000 tons and equipped with cruise missiles);
- twenty Offshore Combatant Vessels, under Project SEA 1180, to replace the Armidale, Huon, Leeuwin, and Paluma classes (up to 2000 tons); and
- one Strategic Sealift Vessel to replace the second Kanimbla-class ship (~15,000 tons, similar to the Spanish Galicia-class landing platform dock).
Read more about this topic: Royal Australian Navy
Famous quotes containing the word future:
“Perhaps if the future existed, concretely and individually, as something that could be discerned by a better brain, the past would not be so seductive: its demands would be balanced by those of the future. Persons might then straddle the middle stretch of the seesaw when considering this or that object. It might be fun.”
—Vladimir Nabokov (18991977)
“Thou, too, sail on, O Ship of State!
Sail on, O Union, strong and great!
Humanity with all its fears,
With all the hopes of future years,
Is hanging breathless on thy fate!”
—Henry Wadsworth Longfellow (18071882)
“All radio is dead. Which means that these tape recordings Im making are for the sake of future history. If any.”
—Barré Lyndon (18961972)