Flood Defences
In 1951, very heavy rainfall resulted in large portions of the Tone valley below Taunton flooding. Analysis of what had happened indicated that the channel was of insufficient size to carry the volume of water, which fell on the hills to the west and then flowed down the river. The easy solution of widening the channel was not available, as there were houses built along the south-eastern bank for around 2 miles (3.2 km) above the junction with the River Parrett. The flooding revealed that although these properties were not normally affected by floods, there was significant seepage through the banks. There was no likelihood of sufficient money being available to buy all the houses to demolish them, and so a program of constructing concrete cores in the centre of the banks began in 1956 and continued until 1964.
Rainfall in October 1960 was even heavier, when 9.72 inches (247 mm) fell on the Somerset Levels, representing 249 per cent of the normal levels. Again the valley flooded, and large areas of Taunton were under water to a depth of 3 feet (0.91 m). Plans for a flood relief channel centred at first on the Bridgwater to Taunton Canal, which follows a slightly higher course to the west, and does not run through peat, but the estimated cost of £1.7 million was prohibitive, and so a scheme to upgrade the river costing around one third of that was implemented. This involved straightening of the river where it meandered, widening the bridge openings, and the demolition of navigation locks and weirs.
A new sluice was constructed at Newbridge, incorporating tidal gates, which effectively prevent tides from passing further up the river. The removal of the navigation works at Ham proved particularly difficult, and acted as a training exercise for the Territorial Royal Engineers. Men from the 205 (Wessex) Field Squadron RE (TA) used 200 pounds (91 kg) of explosives to blow up the half-lock and a mud-filled barge which could not be moved. The river banks were raised to give more protection to the villages of Creech St Michael, Ham and Ruishton, but the channel was still only capable of discharging 2,500 cubic feet per second (71 m3/s), whereas the channels through Taunton were designed to handle 4,500 cu ft/s (130 m3/s), and were unlikely to overflow until discharges reached 6,000 cu ft/s (170 m3/s). Curry Moor is therefore used as a washland, and excess water floods over it, to be pumped out at a later date by the Curry Moor pumping station, situated on the banks of the river below the railway bridge. The programme began in 1965 and was completed in 1967.
The first Curry Moor pumping station was built in 1864, to house a steam engine and pump. A cottage for the operator was built next to it at the same time. This installation lasted until 1955, when a new pumphouse was constructed to house two diesel pumps. The steam engine was retained for historical reasons, and is located in part of the new building. The diesel pumps were supplemented by an electric pump in 1983, and a programme of refurbishment was carried out in 2008, which included the construction of a new outfall into the river.
Read more about this topic: River Tone
Famous quotes containing the word flood:
“There are flood and drouth
Over the eyes and in the mouth,
Dead water and dead sand
Contending for the upper hand.
The parched eviscerate soil
Gapes at the vanity of toil,
Laughs without mirth.
This is the death of the earth.”
—T.S. (Thomas Stearns)