The river is currently navigable for 16.6 miles (26.7 km) from its junction with the River Great Ouse to Santon Downham bridge. There are references to its use by boats carrying goods to Brandon as early as the 13th century, and barges are known to have reached Thetford, some 6 miles (9.7 km) beyond Santon Downham when the river was tidal. Stone from Barnack, used in the construction of Thetford Priory in the 12th century, was almost certainly moved along the river, and improvements to the channel were authorised by the Commissioners of Sewers as early as 1575. Further documentary evidence confirms that it was navigable as far as Thetford in 1664.
However, water levels dropped when Denver Sluice was built on the River Great Ouse. An Act of Parliament authorised the Corporation of Thetford to make improvements to the river in 1670, but they were unable to carry out the work, and so the Rt Hon Henry, Earl of Arlington made the improvements, and was assigned the tolls as a result. A series of staunches were built, to hold back the water and raise the levels, but they were too far apart to be effective. The rights of the navigation were given to Thetford Corporation by Henry's daughter Isabella in 1696, and the Corporation had to build a new staunch near Thetford in 1742, in order to maintain water levels in the town.
By 1750, disputes were arising, since all the original Commissioners were dead, and they had failed to appoint replacements. A new Act of Parliament was sought and obtained in 1751, which appointed new Commissioners. Immediately, Thetford Corporation made improvements to the river, constructing staunches at Thetford, Thetford Middle, Turfpool, Croxton, Santon, Brandon and Sheepwash. An eighth staunch was built later at Crosswater, where Lakenheath Lode joins the river. A further Act was obtained in 1789, which regularised the collection of tolls on the whole river by Thetford Corporation. They rebuilt the seven staunches between 1827 and 1835, and the £955 of income received from the navigation in 1833 accounted for over 90 per cent of the total income of the Corporation.
The 1770s saw a grand plan to build a canal from the Little Ouse at Thetford to the River Stort at Bishops Stortford. With a spur to Cambridge, this would have enabled goods to reach London by canal from much of East Anglia. Although the capital cost could not be justified, it was not until the 1850s and the advent of the railways that the scheme was finally abandoned.
Tolls reached a record £1,728 in 1845, when over 15,000 tonnes of coal were carried, but the arrival of the railways, in the form of a line from Norwich to Brandon, and an extension of the Eastern Counties Railway from Newport to Brandon, both opened on the same day in 1845, started the rapid decline of the navigation. Tolls had fallen to £439 by 1849. The tolls were leased to private individuals from 1850, but an attempt to transfer £320 to the Council finance committee from the navigation in 1859 resulted in nearly a year of legal wrangling, and ultimately the money was repaid in 1860. The state of the navigation declined steadily, although there was still commercial traffic, and a 25-foot (7.6 m) paddle steamer ran trips to Cambridge and around the local waterways in the 1880s.
Repairs were again necessary in the 1890s, but with no funds available, the navigation committee asked Fisons, who ran a 50-foot (15 m) screw tug called Speedwell to tow lighters to King's Lynn, for an advance on their tolls to fund the work. This arrangement continued, and kept the navigation open for some years. When Henry de Salis visited it in 1904, he reported that most of the staunches were out of order, and that it was in poor condition. The Bedford Level Commissioners kept the weed removed from the lower section, and the South Level Commissioners maintained Crosswater Staunch, but commercial traffic had ceased by the start of the First World War. Responsibility for the river passed to the Great Ouse Catchment Board with the passing of the Land Drainage Act of 1930, and they removed the staunches, replacing those at Thetford and at Brandon with sluices. Responsibility changed again with the formation of the Environment Agency in 1995.
The navigable river is mainly on the same level, with a single lock, which was opened in 1995, at Brandon just a short distance from Brandon bridge. The lock is 13 feet (4.0 m) wide but only 39 feet (12 m) long, and so is not suitable for many narrow boats, although boats up to 79 feet (24 m) long can be turned just below the lock, which is less than 0.5 miles (0.80 km) from Brandon village.
There is a campaign to re-open the river for navigation to Thetford, and the Environment Agency commissioned consultants in 2003 to look at the feasibility of such a project. The report suggested that four locks would be required on this section. The head of navigation was effectively extended in 2008 when the 2.5-mile (4.0 km) section from Brandon Bridge to Santon Downham was made more accessible to boaters by the construction of moorings just below Santon Downham bridge, which are now managed by the Great Ouse Boating Association. Beyond the bridge the river is only accessible to canoes and dingies, due to the presence of rocks on the river bed.