River Idle - Navigation

Navigation

The river is navigable for around 11 miles (18 km) from West Stockwith to Bawtry. Access to the river is through the sluice gates, and so the Environment Agency, who are responsible for the waterway, require 48 hours notice of intent to enter the river. There is also a high toll for doing so, with the result that most boaters that enter the river do so as part of a group, so that the cost can be shared. The space between the two sluices is effectively used as a very large lock, capable of holding a number of boats. Entrance through the first sluice is only possible for an hour either side of high tide. The Environment Agency also require all boaters to sign an indemnity form, which absolves them of any responsibility for loss or damage to boats.

Boats using the river can reach Bawtry bridge. Size is restricted to 59.7 by 18 feet (18.2 by 5.5 m), with a draft of 2.5 feet (0.76 m) and headroom of 9 feet (2.7 m). There are no public moorings. Large boats can turn round with care either side of Bawtry bridge, and at the point where the River Ryton joins the Idle. Above this point, the river can be navigated by canoes all the way from its source. Access to the river can be gained from a bridge over the River Meden some 110 yards (100 m) above the junction with the River Maun, where the Idle starts.

The river also provides water for the Chesterfield Canal. A feeder was constructed in the 1770s, which left the river some 2 miles (3.2 km) above the Retford aqueduct, so that water could flow by gravity to the canal. This arrangement was replaced by an electric pumping station at the foot of the aqueduct in the 1970s.

Read more about this topic:  River Idle