Drainage

The problems of flooding of the land adjacent to the river were addressed by the construction of catchwater drains to both sides of it. The east side of the river was protected by the Holderness Drainage scheme. John Grundy worked on plans for the scheme which would protect 11,000 acres (4,500 ha) of low-lying land to the north-east of Hull. John Smeaton was also involved, although the final report was largely Grundy's work, and an Act of Parliament to authorise the work was passed on 5 April 1764. The Trustees for the scheme wrote to Grundy and Smeaton in May 1764, asking them to work on the project. Grundy's wife had died only a fortnight previously, and the two engineers corresponded, but besides valuable comment on Grundy's plans for the outfall sluice, Smeaton had no further involvement, and it was Grundy who ran the project, which included 17 miles (27 km) of barrier bank along the east side of the river. John Hoggard acted as Superintendent for the scheme, while Joseph Page was appointed as resident engineer, to oversee the construction of the drains and the outfall sluice. Grundy made regular visits until October 1767, by which time the sluice and the main drainage channels were completed, at which point he and Page moved on, while Hoggard oversaw additional work on the drains and banks, which lasted for several more years. By the time of its completion in 1772, the scheme had cost £24,000.

Despite the Holderness scheme, there were still problems near Leven and Weel, and William Jessop spent a month inspecting the area before writing a report in July 1786. His plan advocated separating the water which fell on the uplands to the north and flowed through the low-lying areas, from the local drainage of those low-lying areas. George Plummer carried out most of the subsequent survey work on Jessop's behalf, although Jessop surveyed the River Hull in 1787, to identify how the outfall could be improved. Jessop visited the works from time to time, making seven visits between 1789 and 1792, while the day to day oversight of the scheme was handled by Plummer as resident engineer. Plummer was succeeded by Anthony Bower, who was engineer from 1792 to 1795, and the whole scheme was completed in 1805, having cost £16,000.

In 1796, Robert Chapman was asked to report on possible solutions for flooding to the west. His report formed the basis for the Beverley and Barmston Drainage Act, which was passed by Parliament in June 1798. Chapman was appointed as engineer for the scheme, which would cost £115,000, and would provide flood defences and drainage for 12,600 acres (5,100 ha) of land to the west of the river. The project included the construction of 23 miles (37 km) of drainage cuts, and building embankments along 20 miles (32 km) of the river. At Hull, an outfall sluice was constructed, and the drain passed through tunnels under eleven waterways, including the Beverley Beck. 27 bridges were built to carry roads over the drain, and the whole project was finished in 1810.

Read more about this topic:  River Hull