Red River Floodway - History

History

Construction of the Floodway started on October 6, 1962 and finished in March 1968. The construction was a major undertaking with 76.5 million cubic metres (2.75 billion cubic feet) of earth excavated—more than what was moved for the Suez Canal.

At the time, the project was the second largest earth-moving project in the world – next only to the construction of the Panama Canal. The total cost at the time was $63 Million (CAD), equivalent to approximately $360 million today.

Read more about this topic:  Red River Floodway

Famous quotes containing the word history:

    The history of the past is but one long struggle upward to equality.
    Elizabeth Cady Stanton (1815–1902)

    When the coherence of the parts of a stone, or even that composition of parts which renders it extended; when these familiar objects, I say, are so inexplicable, and contain circumstances so repugnant and contradictory; with what assurance can we decide concerning the origin of worlds, or trace their history from eternity to eternity?
    David Hume (1711–1776)

    A country grows in history not only because of the heroism of its troops on the field of battle, it grows also when it turns to justice and to right for the conservation of its interests.
    Aristide Briand (1862–1932)