Railway Signalling - Timetable Operation

Timetable Operation

The simplest form of operation, at least in terms of equipment, is to run the system according to a timetable. A fixed schedule is drawn up with which every train crew must be familiar. Trains may only run on each section of track at their scheduled time, during which they have 'possession' and no other train is permitted to use the same section.

When trains are running in opposite directions on a single-track railroad, meeting points ("meets") are scheduled, at which each train must wait for the other at a passing place. Neither train is permitted to move before the other has arrived. In the US the display of two green flags (green lights at night) is an indication that another train is following the first and the waiting train must wait for the next train to pass. In addition, the train carrying the flags gives eight blasts on the whistle as it approaches. The waiting train must return eight blasts before the flag carrying train may proceed.

The timetable system has several disadvantages. First, there is no positive confirmation that the track ahead is clear, only that it is scheduled to be clear. The system does not allow for engine failures and other such problems, but the timetable is set up so that there should be sufficient time between trains for the crew of a failed or delayed train to walk far enough to set warning flags, flares, and detonators or torpedoes (UK and US terminology, respectively) to alert any other train crew.

A second problem is the system's inflexibility. Trains cannot be added, delayed, or rescheduled without advance notice.

A third problem is a corollary of the second: the system is inefficient. To provide flexibility, the timetable must give trains a broad allocation of time to allow for delays, so the line is in the possession of each train for longer than is otherwise necessary.

Nonetheless, this system permits operation on a vast scale, with no requirements for any kind of communication that travels faster than a train. Timetable operation was the normal mode of operation in North America in the early days of the railroad.

Read more about this topic:  Railway Signalling

Famous quotes containing the word operation:

    An absolute can only be given in an intuition, while all the rest has to do with analysis. We call intuition here the sympathy by which one is transported into the interior of an object in order to coincide with what there is unique and consequently inexpressible in it. Analysis, on the contrary, is the operation which reduces the object to elements already known.
    Henri Bergson (1859–1941)