Quincy Mine - The Mine's Engineering Achievements

The Mine's Engineering Achievements

When the mine ceased production in 1945, the Quincy Number 2 shaft was the world's deepest shaft, at 9,260 feet (2.82 km or 1.75 miles) along the dip of the deposit on a 55 degree decline. To raise and lower ore and workers into this shaft, the world's largest steam-driven mine hoist was built in 1918 and housed in the Quincy Number 2 Hoist House. The Nordberg Steam Hoist and its reinforced concrete building, built in the Georgian architectural style with brick veneer and Italian-tiled walls, cost over $370,000 in 1918 but was used for only eleven years until it ceased usage in 1929. Weighing more than 880 tons, it lifted 10 tons of ore at 36.4 miles per hour, thus saving $16,080 in fuel bills in its first year of operation. The hoist sat on the largest concrete slab ever poured, containing 3200 cu. yards of cement and over 8 tons of reinforcement material. The Number 2 Hoist House was built as a reinforced concrete structure on a scale rare for 1918, making it one of the first of its kind The very decorative Hoist House was used as a showpiece for visiting investors.

Read more about this topic:  Quincy Mine

Famous quotes containing the words engineering and/or achievements:

    Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.
    Merle Colby, U.S. public relief program (1935-1943)

    Our achievements speak for themselves. What we have to keep track of are our failures, discouragements, and doubts. We tend to forget the past difficulties, the many false starts, and the painful groping. We see our past achievements as the end result of a clean forward thrust, and our present difficulties as signs of decline and decay.
    Eric Hoffer (1902–1983)