Qazaqstan Temir Zholy - Rolling Stock

Rolling Stock

In October 2010, Kazakhstan Temir Zholy ordered 295 KZ8A electric locomotives from Alstom, for both freight and passenger services. On October 3, the first train of this order was delivered during an official ceremony. While the first 10 pre-series of KZ8A locomotives are being manufactured at Alstom’s Belfort facility, the remaining will be built in Astana, in the new Alstom plant in Kazakhstan which will be inaugurated on December 12, 2012. Besides, on October 8, 2012, KTZ signed its first maintenance contract with Alstom for the full maintenance, major overhaul and modernization of 27 passenger locomotives KZ4AC for a period of 25 years.

In November 2010, KTZ awarded Talgo a contract to replace its fleet of 3000 intercity vehicles.

Read more about this topic:  Qazaqstan Temir Zholy

Famous quotes containing the words rolling and/or stock:

    The gods had condemned Sisyphus to ceaselessly rolling a rock to the top of a mountain, whence the stone would fall back of its own weight. They had thought with some reason that there is no more dreadful punishment than futile and hopeless labor.
    Albert Camus (1913–1960)

    Death and life were not
    Till man made up the whole,
    Made lock, stock and barrel
    Out of his bitter soul,
    William Butler Yeats (1865–1939)