Qatar Petroleum - Gas-to-liquids

Gas-to-liquids

See also: Pearl GTL

GTL projects received significant attention in Qatar the last several years, and Qatar’s government originally set a target of developing 400,000 bbl/d (64,000 m3/d) of capacity by 2012. However, cancellations and delays substantially lowered this. In February 2007, ExxonMobil canceled its Palm GTL project, which was slated to produce 154,000 bbl/d (24,500 m3/d). The company will instead develop the Barzan Gas Project, scheduled to supply 1.5 Bcf/d by 2012. The Oryx GTL plant is a joint venture of QP and Sasol-Chevron GTL, and has a 34,000 bbl/d (5,400 m3/d) capacity. The plant was commissioned in June 2006, but technical problems prevented the consortium from loading the first export until April 2007. In February 2007, Royal Dutch Shell held a groundbreaking ceremony for its Pearl GTL Project. The Pearl plant will be 51%-owned by QP, though Shell will operate the project with a 49% stake. The facility is expected to use natural gas feedstock to produce 140,000 bbl/d (22,000 m3/d) of GTL products. The project will be developed in phases, with 70,000 bbl/d (11,000 m3/d) capacity expected by 2010 and a second phase expected in 2011. The Pearl project will be the first integrated GTL operation in the world, meaning it will have upstream production integrated with the onshore conversion plant.

Read more about this topic:  Qatar Petroleum