Prestressed Concrete - Unbonded Post-tensioned Concrete

Unbonded Post-tensioned Concrete

Unbonded post-tensioned concrete differs from bonded post-tensioning by providing each individual cable permanent freedom of movement relative to the concrete. To achieve this, each individual tendon is coated with a grease (generally lithium based) and covered by a plastic sheathing formed in an extrusion process. The transfer of tension to the concrete is achieved by the steel cable acting against steel anchors embedded in the perimeter of the slab. The main disadvantage over bonded post-tensioning is the fact that a cable can destress itself and burst out of the slab if damaged (such as during repair on the slab). The advantages of this system over bonded post-tensioning are:

  1. The ability to individually adjust cables based on poor field conditions (For example: shifting a group of 4 cables around an opening by placing 2 to either side).
  2. The procedure of post-stress grouting is eliminated.
  3. The ability to de-stress the tendons before attempting repair work.

Picture number one (below) shows rolls of post-tensioning (PT) cables with the holding end anchors displayed. The holding end anchors are fastened to rebar placed above and below the cable and buried in the concrete locking that end. Pictures numbered two, three and four shows a series of black pulling end anchors from the rear along the floor edge form. Rebar is placed above and below the cable both in front and behind the face of the pulling end anchor. The above and below placement of the rebar can be seen in picture number three and the placement of the rebar in front and behind can be seen in picture number four. The blue cable seen in picture number four is electrical conduit. Picture number five shows the plastic sheathing stripped from the ends of the post-tensioning cables before placement through the pulling end anchors. Picture number six shows the post-tensioning cables in place for concrete pouring. The plastic sheathing has been removed from the end of the cable and the cable has been pushed through the black pulling end anchor attached to the inside of the concrete floor side form. The greased cable can be seen protruding from the concrete floor side form. Pictures seven and eight show the post-tensioning cables protruding from the poured concrete floor. After the concrete floor has been poured and has set for about a week, the cable ends will be pulled with a hydraulic jack.

  • 1. Rolls of post-tensioning cables

  • 2. Pulling anchors for post-tensioning cables

  • 3. Pulling anchors for post-tensioning cables

  • 4. Pulling anchors for post-tensioning cables

  • 5. Post-tensioning cables stripped for placement in pulling anchors

  • 6. Positioned post-tensioning cables

  • 7. Post-tensioning cable ends extending from freshly poured concrete

  • 8. Post-tensioning cable ends extending from concrete slab

  • 9. Hydraulic jack for tensioning cables

  • 10. Cable conduits in formwork

Read more about this topic:  Prestressed Concrete

Famous quotes containing the word concrete:

    Poetry presents indivisible wholes of human consciousness, modified and ordered by the stringent requirements of form. Prose, aiming at a definite and concrete goal, generally suppresses everything inessential to its purpose; poetry, existing only to exhibit itself as an aesthetic object, aims only at completeness and perfection of form.
    Richard Harter Fogle, U.S. critic, educator. The Imagery of Keats and Shelley, ch. 1, University of North Carolina Press (1949)